<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>CSD Engineering</title>
	<atom:link href="https://csdengineering.ie/feed/" rel="self" type="application/rss+xml" />
	<link>https://csdengineering.ie/</link>
	<description></description>
	<lastBuildDate>Fri, 12 Oct 2018 10:24:54 +0000</lastBuildDate>
	<language>en-CA</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>
	<item>
		<title>Kerry Group Global Centre A3 Fit-out Project</title>
		<link>https://csdengineering.ie/kerry-group-global-centre-a3-fit-out-project/</link>
					<comments>https://csdengineering.ie/kerry-group-global-centre-a3-fit-out-project/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 11:18:02 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=184</guid>

					<description><![CDATA[<p>Redesign of the existing Corporate Offices in Naas, Co. Kildare. Areas to include Executive Offices, Meeting Rooms, Boardroom, Phone Booths, Open Plan Office and Social Spaces. Architects: Design Folk Project Duration: 4 months Completion Date: 2019 Project Features: High end architectural &#38; services finish Multiple phases in order to minimize disruption to the client Services [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/kerry-group-global-centre-a3-fit-out-project/">Kerry Group Global Centre A3 Fit-out Project</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Redesign of the existing Corporate Offices in Naas, Co. Kildare. Areas to include Executive Offices, Meeting Rooms, Boardroom, Phone Booths, Open Plan Office and Social Spaces.</p>
<p>Architects: Design Folk</p>
<p>Project Duration: 4 months</p>
<p>Completion Date: 2019</p>
<p>Project Features:</p>
<ul>
<li>High end architectural &amp; services finish</li>
<li>Multiple phases in order to minimize disruption to the client</li>
</ul>
<p>Services Features:</p>
<ul>
<li>Upgrade of existing Lighting and Emergency Lighting installation</li>
<li>Data &amp; power distribution to offices and audio visual equipment</li>
<li>Modifications to fire alarm installation integrated into the existing system</li>
<li>Audio visual fit out in meeting and boardrooms</li>
<li>Alterations to existing VAV air conditioning systems</li>
</ul>
<p>Modifications to sprinkler installation</p>
<p>The post <a href="https://csdengineering.ie/kerry-group-global-centre-a3-fit-out-project/">Kerry Group Global Centre A3 Fit-out Project</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/kerry-group-global-centre-a3-fit-out-project/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Mater Private Hospital Five Lamps Offices Fit Out</title>
		<link>https://csdengineering.ie/five-lamps-offices-fit-out/</link>
					<comments>https://csdengineering.ie/five-lamps-offices-fit-out/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 11:14:09 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Featured Projects]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=182</guid>

					<description><![CDATA[<p>Refurbishment of existing third and fourth offices for MPH Accounts. Architects: MCA Architects Project Duration: 3 months Completion Date: 2018 Services Features: Alterations to existing DX air conditioning system to suit revised cellular and open plan office layout Modifications to existing water services installation to suit new canteen facilities Modifications / extension of existing general [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/five-lamps-offices-fit-out/">Mater Private Hospital Five Lamps Offices Fit Out</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Refurbishment of existing third and fourth offices for MPH Accounts.</p>
<p><strong>Architects</strong>: MCA Architects</p>
<p><strong>Project Duration</strong>: 3 months</p>
<p><strong>Completion Date</strong>: 2018</p>
<p><strong>Services Features</strong>:</p>
<ul>
<li>Alterations to existing DX air conditioning system to suit revised cellular and open plan office layout</li>
<li>Modifications to existing water services installation to suit new canteen facilities</li>
<li>Modifications / extension of existing general services and data installation to suit revised workstation layout</li>
<li>Modifications to existing lighting and emergency lighting installation</li>
<li>Modifications to existing fire alarm installation</li>
</ul>
<p>&nbsp;</p>
<p>The post <a href="https://csdengineering.ie/five-lamps-offices-fit-out/">Mater Private Hospital Five Lamps Offices Fit Out</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/five-lamps-offices-fit-out/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>CSI Ireland Headquarters</title>
		<link>https://csdengineering.ie/csi-ireland-headquarters/</link>
					<comments>https://csdengineering.ie/csi-ireland-headquarters/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 11:10:35 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=180</guid>

					<description><![CDATA[<p>Refurbishment of listed building on Merrion Square Dublin to provide new Ireland Headquarters for the CSI including Reception, Offices, Training Rooms and Boardroom. Archictects: Gensler Architects Project Duration: 6 months Completion Date: 2017 Project Features: Liaison with Conservation Architect High end architectural &#38; services finish Liaison with US based Architect and Data Specialist Services Features: [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/csi-ireland-headquarters/">CSI Ireland Headquarters</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Refurbishment of listed building on Merrion Square Dublin to provide new Ireland Headquarters for the CSI including Reception, Offices, Training Rooms and Boardroom.</p>
<p><strong>Archictects</strong>: Gensler Architects</p>
<p><strong>Project Duration</strong>: 6 months</p>
<p><strong>Completion Date</strong>: 2017</p>
<p><strong>Project Features</strong>:</p>
<ul>
<li>Liaison with Conservation Architect</li>
<li>High end architectural &amp; services finish</li>
<li>Liaison with US based Architect and Data Specialist</li>
</ul>
<p><strong>Services Features</strong>:</p>
<ul>
<li>New gas fired boiler plant and LPHW pipework distribution</li>
<li>New main distribution board and power distribution throughout listed building</li>
<li>New lighting and emergency lighting installation</li>
<li>New fire alarm installation</li>
<li>Audio visual fit out in all areas</li>
<li>New general services and data installation</li>
</ul>
<p>The post <a href="https://csdengineering.ie/csi-ireland-headquarters/">CSI Ireland Headquarters</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/csi-ireland-headquarters/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>HP Liffey Valley Building 1 Redevelopment</title>
		<link>https://csdengineering.ie/liffey-valley-building-1-redevelopment/</link>
					<comments>https://csdengineering.ie/liffey-valley-building-1-redevelopment/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 11:06:43 +0000</pubDate>
				<category><![CDATA[Commercial]]></category>
		<category><![CDATA[Featured Projects]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=178</guid>

					<description><![CDATA[<p>Redesign of the existing Hewlett Packard Enterprise Offices in Liffey Park, Leixlip. Areas include Reception, Meeting Rooms, Boardroom, Phone Booths, Open Plan Office, Canteen and Social Spaces. Architects: Design Folk Project Duration: 6 months Completion Date: 2017 Project Features:  High end architectural &#38; services finish Multiple phases in order to minimize disruption to the client [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/liffey-valley-building-1-redevelopment/">HP Liffey Valley Building 1 Redevelopment</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Redesign of the existing Hewlett Packard Enterprise Offices in Liffey Park, Leixlip. Areas include Reception, Meeting Rooms, Boardroom, Phone Booths, Open Plan Office, Canteen and Social Spaces.</p>
<p><strong>Architects</strong>: Design Folk</p>
<p><strong>Project Duration</strong>: 6 months</p>
<p><strong>Completion Date</strong>: 2017</p>
<p><strong>Project Features: </strong></p>
<ul>
<li>High end architectural &amp; services finish</li>
<li>Multiple phases in order to minimize disruption to the client</li>
</ul>
<p><strong>Services Features:</strong></p>
<ul>
<li>Bespoke timber slotted ceilings with integrated architectural lighting and air distribution system</li>
<li>Lighting dimming management controls</li>
<li>Data &amp; power distribution to offices and audio visual equipment</li>
<li>New fire alarm installation integrated into the existing system</li>
<li>Audio visual fit out in meeting and boardrooms</li>
<li>Alterations to existing VAV air conditioning systems</li>
<li>New comms room</li>
</ul>
<p>The post <a href="https://csdengineering.ie/liffey-valley-building-1-redevelopment/">HP Liffey Valley Building 1 Redevelopment</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/liffey-valley-building-1-redevelopment/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Mater Private Hospital Level 05</title>
		<link>https://csdengineering.ie/level-05/</link>
					<comments>https://csdengineering.ie/level-05/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 10:28:25 +0000</pubDate>
				<category><![CDATA[Healthcare]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=176</guid>

					<description><![CDATA[<p>Fit-out of new floor level over existing main hospital. The project included complex phasing procedures to ensure hospital functionality on the floors below was maintained at all times throughout the construction period. Architects: MCA Architects Completion Date: 2016 Project Features: Enabling works at Level 04, new 28 Bed Ward Accommodation, 2 Bariatric Bedrooms, Isolation Room [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/level-05/">Mater Private Hospital Level 05</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Fit-out of new floor level over existing main hospital. The project included complex phasing procedures to ensure hospital functionality on the floors below was maintained at all times throughout the construction period.</p>
<p><strong>Architects</strong>: MCA Architects</p>
<p><strong>Completion Date</strong>: 2016</p>
<p><strong>Project Features</strong>:</p>
<p>Enabling works at Level 04, new 28 Bed Ward Accommodation, 2 Bariatric Bedrooms, Isolation Room and ancillary hospital accommodation.</p>
<p><strong>Mechanical &amp; Electrical Services Features</strong>:</p>
<ul>
<li>New heating, ventilation and air-conditioning systems to HTM-03 Standard</li>
<li>Expansion of existing central chilled water &amp; LPHW heating installations to serve new AHUs</li>
<li>Expansion of existing water services installation to serve Level 05.</li>
<li>Expansion of existing medical gas installation to serve Level 05.</li>
<li>Alterations to existing soils and wastes drainage installation to serve Level 05</li>
<li>New electrical general services installations</li>
<li>New lighting &amp; emergency lighting systems</li>
<li>New fire alarm &amp; access control systems</li>
<li>Expansion of existing Nurse Call system</li>
<li>New comms room at Level 05</li>
</ul>
<p>The post <a href="https://csdengineering.ie/level-05/">Mater Private Hospital Level 05</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/level-05/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Northern Cross Nursing Home</title>
		<link>https://csdengineering.ie/northern-cross-nursing-home/</link>
					<comments>https://csdengineering.ie/northern-cross-nursing-home/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 10:23:14 +0000</pubDate>
				<category><![CDATA[Healthcare]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=174</guid>

					<description><![CDATA[<p>147 Bed Nursing Home Development, 6 floors over basement. Architects: JNP Architects Project Duration: 18 months Project Completion: August 2015 Services Features: Power and data/wifi distribution systems Lighting and emergency lighting systems c/w controls Fire alarm and detection systems Standby generator system CCTV / security systems Nurse call systems Access control systems &#160;</p>
<p>The post <a href="https://csdengineering.ie/northern-cross-nursing-home/">Northern Cross Nursing Home</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>147 Bed Nursing Home Development, 6 floors over basement.</p>
<p><strong>Architects</strong>: JNP Architects</p>
<p><strong>Project Duration</strong>: 18 months</p>
<p><strong>Project Completion</strong>: August 2015</p>
<p><strong>Services Features</strong>:</p>
<ul>
<li>Power and data/wifi distribution systems</li>
<li>Lighting and emergency lighting systems c/w controls</li>
<li>Fire alarm and detection systems</li>
<li>Standby generator system</li>
<li>CCTV / security systems</li>
<li>Nurse call systems</li>
<li>Access control systems</li>
</ul>
<p>&nbsp;</p>
<p>The post <a href="https://csdengineering.ie/northern-cross-nursing-home/">Northern Cross Nursing Home</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/northern-cross-nursing-home/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Modifications &#038; Expansion to suit Mater Private Hospital Operation</title>
		<link>https://csdengineering.ie/modifications-expansion-to-suit-mater-private-hospital-operation/</link>
					<comments>https://csdengineering.ie/modifications-expansion-to-suit-mater-private-hospital-operation/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 10:16:18 +0000</pubDate>
				<category><![CDATA[Healthcare]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=172</guid>

					<description><![CDATA[<p>Modification and expansion of new hospital to provide the following additional facilities: Pharmacy CSSD ICU / HDU Cardiology Centre Oncology Department Architects: MCA Architects Completion Date: 2014 Services Features: New RO Water treatment system Additional HVAC Chiller plant HVAC to CSSD / Pharmacy Standby Generator upgrade Central Water Storage upgrade Dual fuel heating system (Oil [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/modifications-expansion-to-suit-mater-private-hospital-operation/">Modifications &#038; Expansion to suit Mater Private Hospital Operation</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Modification and expansion of new hospital to provide the following additional facilities:</p>
<ul>
<li>Pharmacy</li>
<li>CSSD</li>
<li>ICU / HDU</li>
<li>Cardiology Centre</li>
<li>Oncology Department</li>
</ul>
<p><strong>Architects</strong>: MCA Architects</p>
<p><strong>Completion Date</strong>: 2014</p>
<p><strong>Services Feature</strong>s:</p>
<ul>
<li>New RO Water treatment system</li>
<li>Additional HVAC Chiller plant</li>
<li>HVAC to CSSD / Pharmacy</li>
<li>Standby Generator upgrade</li>
<li>Central Water Storage upgrade</li>
<li>Dual fuel heating system (Oil / Gas)</li>
</ul>
<p>&nbsp;</p>
<p>The post <a href="https://csdengineering.ie/modifications-expansion-to-suit-mater-private-hospital-operation/">Modifications &#038; Expansion to suit Mater Private Hospital Operation</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/modifications-expansion-to-suit-mater-private-hospital-operation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Mater Private Hospital Cardiology Centre Expansion and Catheterisation Laboratory 3</title>
		<link>https://csdengineering.ie/cardiology-centre-expansion-and-catheterisation-laboratory-3/</link>
					<comments>https://csdengineering.ie/cardiology-centre-expansion-and-catheterisation-laboratory-3/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 10:06:32 +0000</pubDate>
				<category><![CDATA[Healthcare]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=170</guid>

					<description><![CDATA[<p>Expansion at Level 01 and refurbishment of the existing Cardiology Centre over a number of phases to ensure the hospital continued in full operation throughout the construction period. Architects: MCA Architects Project Features: New Catheterisation Laboratory, Ancillary Theatre accommodation, Consultant Suites, ECG rooms and Theatre Recovery Ward. Services Features: New heating, ventilation and air conditioning [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/cardiology-centre-expansion-and-catheterisation-laboratory-3/">Mater Private Hospital Cardiology Centre Expansion and Catheterisation Laboratory 3</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Expansion at Level 01 and refurbishment of the existing Cardiology Centre over a number of phases to ensure the hospital continued in full operation throughout the construction period.</p>
<p><strong>Architects</strong>: MCA Architects</p>
<p><strong>Project Features</strong>:</p>
<p>New Catheterisation Laboratory, Ancillary Theatre accommodation, Consultant Suites, ECG rooms and Theatre Recovery Ward.</p>
<p><strong>Services Features</strong>:</p>
<ul>
<li>New heating, ventilation and air conditioning systems to HTM-03 Standard to serve the Cardiology Centre</li>
<li>Specialised electrical systems for Cardiac / Body protected areas</li>
<li>Bespoke Surgeon Control Panels</li>
<li>Fully integrated Nurse / Cardiac Call System</li>
<li>Modifications to mechanical services systems serving Level 01 without interruption to adjacent areas</li>
<li>Modifications to electrical general services serving Level 01 without interruption to adjacent areas</li>
</ul>
<p>The post <a href="https://csdengineering.ie/cardiology-centre-expansion-and-catheterisation-laboratory-3/">Mater Private Hospital Cardiology Centre Expansion and Catheterisation Laboratory 3</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/cardiology-centre-expansion-and-catheterisation-laboratory-3/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Teva Pharmaceuticals Central Utilities Upgrade Project</title>
		<link>https://csdengineering.ie/central-utilities-upgrade-project/</link>
					<comments>https://csdengineering.ie/central-utilities-upgrade-project/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 09:41:51 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=166</guid>

					<description><![CDATA[<p>Upgrade of existing central Chilled Water and Compressed Air systems including replacement of existing chillers and compressed air plant, new plantroom header arrangement, modifications to the site wide distribution network and implementing energy saving 2-port valve arrangement on the chilled water system. Architects: Fewer Harrington &#38; Partners Project Duration: 9 months Completion Date: November 2016 [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/central-utilities-upgrade-project/">Teva Pharmaceuticals Central Utilities Upgrade Project</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Upgrade of existing central Chilled Water and Compressed Air systems including replacement of existing chillers and compressed air plant, new plantroom header arrangement, modifications to the site wide distribution network and implementing energy saving 2-port valve arrangement on the chilled water system.</p>
<p><strong>Architects</strong>: Fewer Harrington &amp; Partners</p>
<p><strong>Project Duration</strong>: 9 months</p>
<p><strong>Completion Date</strong>: November 2016</p>
<p><strong>Service features</strong>:</p>
<ul>
<li>New air cooled chiller plant (2MW)</li>
<li>New flow and return header arrangement</li>
<li>New primary and secondary circuit pumpsets</li>
<li>Modifications to site wide distribution network to suit new headers</li>
<li>2-port valve installation and recommissioning</li>
<li>BMS controls upgrade</li>
<li>New compressed air plant (compressors, dryers, receivers)</li>
<li>Modifications to site wide distribution network</li>
</ul>
<p>The post <a href="https://csdengineering.ie/central-utilities-upgrade-project/">Teva Pharmaceuticals Central Utilities Upgrade Project</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/central-utilities-upgrade-project/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Hewlett Packard Chilled Water Upgrade</title>
		<link>https://csdengineering.ie/chilled-water-updgrade/</link>
					<comments>https://csdengineering.ie/chilled-water-updgrade/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 09:29:21 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=161</guid>

					<description><![CDATA[<p>Upgrade of existing site wide chilled water system including replacement Cooling Towers, pipework and BMS controls modifications. Project Duration: 18 months Completion Date: 2017 Service Features: Replace 4No existing 3.75MW cooling towers with new Replace existing pumpsets with new Enabling and strip-out works Pipework modifications BMS controls modifications and recommissioning</p>
<p>The post <a href="https://csdengineering.ie/chilled-water-updgrade/">Hewlett Packard Chilled Water Upgrade</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Upgrade of existing site wide chilled water system including replacement Cooling Towers, pipework and BMS controls modifications.</p>
<p><strong>Project Duration:</strong> 18 months</p>
<p><strong>Completion Date:</strong> 2017</p>
<p><strong>Service Features:</strong></p>
<ul>
<li>Replace 4No existing 3.75MW cooling towers with new</li>
<li>Replace existing pumpsets with new</li>
<li>Enabling and strip-out works</li>
<li>Pipework modifications</li>
<li>BMS controls modifications and recommissioning</li>
</ul>
<p>The post <a href="https://csdengineering.ie/chilled-water-updgrade/">Hewlett Packard Chilled Water Upgrade</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/chilled-water-updgrade/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
