<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Industrial Archives - CSD Engineering</title>
	<atom:link href="https://csdengineering.ie/category/projects/industrial/feed/" rel="self" type="application/rss+xml" />
	<link>https://csdengineering.ie/category/projects/industrial/</link>
	<description></description>
	<lastBuildDate>Fri, 12 Oct 2018 10:24:54 +0000</lastBuildDate>
	<language>en-CA</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.6.2</generator>
	<item>
		<title>Teva Pharmaceuticals Central Utilities Upgrade Project</title>
		<link>https://csdengineering.ie/central-utilities-upgrade-project/</link>
					<comments>https://csdengineering.ie/central-utilities-upgrade-project/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 09:41:51 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=166</guid>

					<description><![CDATA[<p>Upgrade of existing central Chilled Water and Compressed Air systems including replacement of existing chillers and compressed air plant, new plantroom header arrangement, modifications to the site wide distribution network and implementing energy saving 2-port valve arrangement on the chilled water system. Architects: Fewer Harrington &#38; Partners Project Duration: 9 months Completion Date: November 2016 [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/central-utilities-upgrade-project/">Teva Pharmaceuticals Central Utilities Upgrade Project</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Upgrade of existing central Chilled Water and Compressed Air systems including replacement of existing chillers and compressed air plant, new plantroom header arrangement, modifications to the site wide distribution network and implementing energy saving 2-port valve arrangement on the chilled water system.</p>
<p><strong>Architects</strong>: Fewer Harrington &amp; Partners</p>
<p><strong>Project Duration</strong>: 9 months</p>
<p><strong>Completion Date</strong>: November 2016</p>
<p><strong>Service features</strong>:</p>
<ul>
<li>New air cooled chiller plant (2MW)</li>
<li>New flow and return header arrangement</li>
<li>New primary and secondary circuit pumpsets</li>
<li>Modifications to site wide distribution network to suit new headers</li>
<li>2-port valve installation and recommissioning</li>
<li>BMS controls upgrade</li>
<li>New compressed air plant (compressors, dryers, receivers)</li>
<li>Modifications to site wide distribution network</li>
</ul>
<p>The post <a href="https://csdengineering.ie/central-utilities-upgrade-project/">Teva Pharmaceuticals Central Utilities Upgrade Project</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/central-utilities-upgrade-project/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Hewlett Packard Chilled Water Upgrade</title>
		<link>https://csdengineering.ie/chilled-water-updgrade/</link>
					<comments>https://csdengineering.ie/chilled-water-updgrade/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 09:29:21 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=161</guid>

					<description><![CDATA[<p>Upgrade of existing site wide chilled water system including replacement Cooling Towers, pipework and BMS controls modifications. Project Duration: 18 months Completion Date: 2017 Service Features: Replace 4No existing 3.75MW cooling towers with new Replace existing pumpsets with new Enabling and strip-out works Pipework modifications BMS controls modifications and recommissioning</p>
<p>The post <a href="https://csdengineering.ie/chilled-water-updgrade/">Hewlett Packard Chilled Water Upgrade</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Upgrade of existing site wide chilled water system including replacement Cooling Towers, pipework and BMS controls modifications.</p>
<p><strong>Project Duration:</strong> 18 months</p>
<p><strong>Completion Date:</strong> 2017</p>
<p><strong>Service Features:</strong></p>
<ul>
<li>Replace 4No existing 3.75MW cooling towers with new</li>
<li>Replace existing pumpsets with new</li>
<li>Enabling and strip-out works</li>
<li>Pipework modifications</li>
<li>BMS controls modifications and recommissioning</li>
</ul>
<p>The post <a href="https://csdengineering.ie/chilled-water-updgrade/">Hewlett Packard Chilled Water Upgrade</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/chilled-water-updgrade/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Eurofins new food &#038; water test laboratories with associated office accommodation</title>
		<link>https://csdengineering.ie/new-food-water-test-laboratories-with-associated-office-accommodation/</link>
					<comments>https://csdengineering.ie/new-food-water-test-laboratories-with-associated-office-accommodation/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 09:16:24 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=159</guid>

					<description><![CDATA[<p>Extension to original facility to provide additional test laboratories and office accommodation in Dungarvan, Co.Waterford. Architects: Fewer Harrington &#38; Partners Project Duration: 12 months Completion Date: July 2018 Service Features: Heating, Ventilation and Air Conditioning Installation Water Services Chemical Wastes Compressed Air and Laboratory Gases Chilled Water Installation</p>
<p>The post <a href="https://csdengineering.ie/new-food-water-test-laboratories-with-associated-office-accommodation/">Eurofins new food &#038; water test laboratories with associated office accommodation</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Extension to original facility to provide additional test laboratories and office accommodation in Dungarvan, Co.Waterford.</p>
<p><strong>Architects</strong>: Fewer Harrington &amp; Partners</p>
<p><strong>Project Duration</strong>: 12 months</p>
<p><strong>Completion Date</strong>: July 2018</p>
<p><strong>Service Features:</strong></p>
<ul>
<li>Heating, Ventilation and Air Conditioning Installation</li>
<li>Water Services</li>
<li>Chemical Wastes</li>
<li>Compressed Air and Laboratory Gases</li>
</ul>
<p>Chilled Water Installation</p>
<p>The post <a href="https://csdengineering.ie/new-food-water-test-laboratories-with-associated-office-accommodation/">Eurofins new food &#038; water test laboratories with associated office accommodation</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/new-food-water-test-laboratories-with-associated-office-accommodation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Almarai Ready to Feed Production Facility</title>
		<link>https://csdengineering.ie/almarai-company-ready-to-feed-production-facility/</link>
					<comments>https://csdengineering.ie/almarai-company-ready-to-feed-production-facility/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 09:09:24 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=155</guid>

					<description><![CDATA[<p>New ‘Ready To Feed’ infant nutrition production line at the Almarai International Pediatric Nutrition Company (IPNC) facility in Al Kharj, KSA. Completion Date: November 2016 Project Duration: 6 months Mechanical &#38; Electrical Service Features: HVAC systems. Equipment exhaust systems Steam / Condensate. Production equipment (Retort) cooling systems (cooling tower water and glycol water). Compressed air [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/almarai-company-ready-to-feed-production-facility/">Almarai Ready to Feed Production Facility</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>New ‘Ready To Feed’ infant nutrition production line at the Almarai International Pediatric Nutrition Company (IPNC) facility in Al Kharj, KSA.</p>
<p><strong>Completion Date</strong>: November 2016</p>
<p><strong>Project Duration</strong>: 6 months</p>
<p><strong>Mechanical &amp; Electrical Service Features</strong>:</p>
<ul>
<li>HVAC systems.</li>
<li>Equipment exhaust systems</li>
<li>Steam / Condensate.</li>
<li>Production equipment (Retort) cooling systems (cooling tower water and glycol water).</li>
<li>Compressed air installation.</li>
<li>Ingredient water system.</li>
<li>New power distribution network to serve production equipment</li>
<li>New standby power (UPS) installation to production equipment</li>
<li>New lighting and emergency lighting.</li>
<li>Modifications to existing fire detection systems.</li>
<li>Modification and extension of existing sprinkler installation</li>
</ul>
<p>The post <a href="https://csdengineering.ie/almarai-company-ready-to-feed-production-facility/">Almarai Ready to Feed Production Facility</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/almarai-company-ready-to-feed-production-facility/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Eirgen Project Desha New OSD and Fill Finish Production Cleanrooms</title>
		<link>https://csdengineering.ie/eirgen-project-desha-new-osd-and-fill-finish-production-cleanrooms/</link>
					<comments>https://csdengineering.ie/eirgen-project-desha-new-osd-and-fill-finish-production-cleanrooms/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Thu, 20 Sep 2018 07:54:36 +0000</pubDate>
				<category><![CDATA[Featured Projects]]></category>
		<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=77</guid>

					<description><![CDATA[<p>Extension to original facility to provide new a OSD and Fill Finish Production Cleanrooms with associated laboratories and support office accommodation in IDA Advance Facility Waterford. Architects: Fewer Harrington &#38; Partners Project Duration: 18 Months Completion date: June 2018 Service Features: Enabling works to facilitate building extension New Central Utilities Building including scope for future [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/eirgen-project-desha-new-osd-and-fill-finish-production-cleanrooms/">Eirgen Project Desha New OSD and Fill Finish Production Cleanrooms</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Extension to original facility to provide new a OSD and Fill Finish Production Cleanrooms with associated laboratories and support office accommodation in IDA Advance Facility Waterford.</p>
<p><strong>Architects</strong>: Fewer Harrington &amp; Partners</p>
<p><strong>Project Duration</strong>: 18 Months</p>
<p><strong>Completion date</strong>: June 2018</p>
<p><strong>Service Features</strong>:</p>
<ul>
<li>Enabling works to facilitate building extension</li>
<li>New Central Utilities Building including scope for future expansion</li>
<li>Dedicated HVAC systems to production cleanrooms and office areas.</li>
<li>New central plant to serve production facility and support office accommodation (Steam / LTHW / CHW).</li>
<li>New power distribution network to serve production equipment</li>
<li>New security and CCTV installations.</li>
<li>New data and general services installation</li>
<li>New fire detection systems</li>
<li>Modifications to existing office accommodation.</li>
<li>Water services installation</li>
<li>HPLC chemical Wastes</li>
<li>Compressed air and laboratory gases installation</li>
</ul>
<p>The post <a href="https://csdengineering.ie/eirgen-project-desha-new-osd-and-fill-finish-production-cleanrooms/">Eirgen Project Desha New OSD and Fill Finish Production Cleanrooms</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/eirgen-project-desha-new-osd-and-fill-finish-production-cleanrooms/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Rexam extension to existing facility</title>
		<link>https://csdengineering.ie/project-commercial/</link>
					<comments>https://csdengineering.ie/project-commercial/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Wed, 19 Sep 2018 15:43:04 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=58</guid>

					<description><![CDATA[<p>Extension to existing production facility including new MV/LV Switchrooms, production piped services, central services plant and support office accommodation. Architects: Fewer Harrington &#38; Partners Completion Date: December 2018 Mechanical &#38; Electrical Services Features: Power upgrade to serve extended production facility. Enabling works to facilitate building extension Dedicated HVAC systems to production and office areas. New [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/project-commercial/">Rexam extension to existing facility</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Extension to existing production facility including new MV/LV Switchrooms, production piped services, central services plant and support office accommodation.</p>
<p><strong>Architects</strong>: Fewer Harrington &amp; Partners</p>
<p><strong>Completion Date</strong>: December 2018</p>
<p><strong>Mechanical &amp; Electrical Services Features</strong>:</p>
<ul>
<li>Power upgrade to serve extended production facility.</li>
<li>Enabling works to facilitate building extension</li>
<li>Dedicated HVAC systems to production and office areas.</li>
<li>New LTHW/CHW central plant to serve extended production facility and support office accommodation.</li>
<li>Extension / upgrade of existing production piped services.</li>
<li>Extension / upgrade of existing sprinkler installation including new pumphouse, pumpsets and main distribution pipework.</li>
<li>New power distribution network to serve production equipment</li>
<li>Extension of existing security and CCTV installations.</li>
<li>Modifications to existing office and storage areas.</li>
</ul>
<p>&nbsp;</p>
<p>The post <a href="https://csdengineering.ie/project-commercial/">Rexam extension to existing facility</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/project-commercial/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
