<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Healthcare Archives - CSD Engineering</title>
	<atom:link href="https://csdengineering.ie/category/projects/healthcare/feed/" rel="self" type="application/rss+xml" />
	<link>https://csdengineering.ie/category/projects/healthcare/</link>
	<description></description>
	<lastBuildDate>Fri, 12 Oct 2018 10:18:53 +0000</lastBuildDate>
	<language>en-CA</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.6.2</generator>
	<item>
		<title>Mater Private Hospital Level 05</title>
		<link>https://csdengineering.ie/level-05/</link>
					<comments>https://csdengineering.ie/level-05/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 10:28:25 +0000</pubDate>
				<category><![CDATA[Healthcare]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=176</guid>

					<description><![CDATA[<p>Fit-out of new floor level over existing main hospital. The project included complex phasing procedures to ensure hospital functionality on the floors below was maintained at all times throughout the construction period. Architects: MCA Architects Completion Date: 2016 Project Features: Enabling works at Level 04, new 28 Bed Ward Accommodation, 2 Bariatric Bedrooms, Isolation Room [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/level-05/">Mater Private Hospital Level 05</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Fit-out of new floor level over existing main hospital. The project included complex phasing procedures to ensure hospital functionality on the floors below was maintained at all times throughout the construction period.</p>
<p><strong>Architects</strong>: MCA Architects</p>
<p><strong>Completion Date</strong>: 2016</p>
<p><strong>Project Features</strong>:</p>
<p>Enabling works at Level 04, new 28 Bed Ward Accommodation, 2 Bariatric Bedrooms, Isolation Room and ancillary hospital accommodation.</p>
<p><strong>Mechanical &amp; Electrical Services Features</strong>:</p>
<ul>
<li>New heating, ventilation and air-conditioning systems to HTM-03 Standard</li>
<li>Expansion of existing central chilled water &amp; LPHW heating installations to serve new AHUs</li>
<li>Expansion of existing water services installation to serve Level 05.</li>
<li>Expansion of existing medical gas installation to serve Level 05.</li>
<li>Alterations to existing soils and wastes drainage installation to serve Level 05</li>
<li>New electrical general services installations</li>
<li>New lighting &amp; emergency lighting systems</li>
<li>New fire alarm &amp; access control systems</li>
<li>Expansion of existing Nurse Call system</li>
<li>New comms room at Level 05</li>
</ul>
<p>The post <a href="https://csdengineering.ie/level-05/">Mater Private Hospital Level 05</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/level-05/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Northern Cross Nursing Home</title>
		<link>https://csdengineering.ie/northern-cross-nursing-home/</link>
					<comments>https://csdengineering.ie/northern-cross-nursing-home/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 10:23:14 +0000</pubDate>
				<category><![CDATA[Healthcare]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=174</guid>

					<description><![CDATA[<p>147 Bed Nursing Home Development, 6 floors over basement. Architects: JNP Architects Project Duration: 18 months Project Completion: August 2015 Services Features: Power and data/wifi distribution systems Lighting and emergency lighting systems c/w controls Fire alarm and detection systems Standby generator system CCTV / security systems Nurse call systems Access control systems &#160;</p>
<p>The post <a href="https://csdengineering.ie/northern-cross-nursing-home/">Northern Cross Nursing Home</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>147 Bed Nursing Home Development, 6 floors over basement.</p>
<p><strong>Architects</strong>: JNP Architects</p>
<p><strong>Project Duration</strong>: 18 months</p>
<p><strong>Project Completion</strong>: August 2015</p>
<p><strong>Services Features</strong>:</p>
<ul>
<li>Power and data/wifi distribution systems</li>
<li>Lighting and emergency lighting systems c/w controls</li>
<li>Fire alarm and detection systems</li>
<li>Standby generator system</li>
<li>CCTV / security systems</li>
<li>Nurse call systems</li>
<li>Access control systems</li>
</ul>
<p>&nbsp;</p>
<p>The post <a href="https://csdengineering.ie/northern-cross-nursing-home/">Northern Cross Nursing Home</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/northern-cross-nursing-home/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Modifications &#038; Expansion to suit Mater Private Hospital Operation</title>
		<link>https://csdengineering.ie/modifications-expansion-to-suit-mater-private-hospital-operation/</link>
					<comments>https://csdengineering.ie/modifications-expansion-to-suit-mater-private-hospital-operation/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 10:16:18 +0000</pubDate>
				<category><![CDATA[Healthcare]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=172</guid>

					<description><![CDATA[<p>Modification and expansion of new hospital to provide the following additional facilities: Pharmacy CSSD ICU / HDU Cardiology Centre Oncology Department Architects: MCA Architects Completion Date: 2014 Services Features: New RO Water treatment system Additional HVAC Chiller plant HVAC to CSSD / Pharmacy Standby Generator upgrade Central Water Storage upgrade Dual fuel heating system (Oil [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/modifications-expansion-to-suit-mater-private-hospital-operation/">Modifications &#038; Expansion to suit Mater Private Hospital Operation</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Modification and expansion of new hospital to provide the following additional facilities:</p>
<ul>
<li>Pharmacy</li>
<li>CSSD</li>
<li>ICU / HDU</li>
<li>Cardiology Centre</li>
<li>Oncology Department</li>
</ul>
<p><strong>Architects</strong>: MCA Architects</p>
<p><strong>Completion Date</strong>: 2014</p>
<p><strong>Services Feature</strong>s:</p>
<ul>
<li>New RO Water treatment system</li>
<li>Additional HVAC Chiller plant</li>
<li>HVAC to CSSD / Pharmacy</li>
<li>Standby Generator upgrade</li>
<li>Central Water Storage upgrade</li>
<li>Dual fuel heating system (Oil / Gas)</li>
</ul>
<p>&nbsp;</p>
<p>The post <a href="https://csdengineering.ie/modifications-expansion-to-suit-mater-private-hospital-operation/">Modifications &#038; Expansion to suit Mater Private Hospital Operation</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/modifications-expansion-to-suit-mater-private-hospital-operation/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Mater Private Hospital Cardiology Centre Expansion and Catheterisation Laboratory 3</title>
		<link>https://csdengineering.ie/cardiology-centre-expansion-and-catheterisation-laboratory-3/</link>
					<comments>https://csdengineering.ie/cardiology-centre-expansion-and-catheterisation-laboratory-3/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Tue, 09 Oct 2018 10:06:32 +0000</pubDate>
				<category><![CDATA[Healthcare]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=170</guid>

					<description><![CDATA[<p>Expansion at Level 01 and refurbishment of the existing Cardiology Centre over a number of phases to ensure the hospital continued in full operation throughout the construction period. Architects: MCA Architects Project Features: New Catheterisation Laboratory, Ancillary Theatre accommodation, Consultant Suites, ECG rooms and Theatre Recovery Ward. Services Features: New heating, ventilation and air conditioning [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/cardiology-centre-expansion-and-catheterisation-laboratory-3/">Mater Private Hospital Cardiology Centre Expansion and Catheterisation Laboratory 3</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Expansion at Level 01 and refurbishment of the existing Cardiology Centre over a number of phases to ensure the hospital continued in full operation throughout the construction period.</p>
<p><strong>Architects</strong>: MCA Architects</p>
<p><strong>Project Features</strong>:</p>
<p>New Catheterisation Laboratory, Ancillary Theatre accommodation, Consultant Suites, ECG rooms and Theatre Recovery Ward.</p>
<p><strong>Services Features</strong>:</p>
<ul>
<li>New heating, ventilation and air conditioning systems to HTM-03 Standard to serve the Cardiology Centre</li>
<li>Specialised electrical systems for Cardiac / Body protected areas</li>
<li>Bespoke Surgeon Control Panels</li>
<li>Fully integrated Nurse / Cardiac Call System</li>
<li>Modifications to mechanical services systems serving Level 01 without interruption to adjacent areas</li>
<li>Modifications to electrical general services serving Level 01 without interruption to adjacent areas</li>
</ul>
<p>The post <a href="https://csdengineering.ie/cardiology-centre-expansion-and-catheterisation-laboratory-3/">Mater Private Hospital Cardiology Centre Expansion and Catheterisation Laboratory 3</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/cardiology-centre-expansion-and-catheterisation-laboratory-3/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Mater Private Hospital Major Expansion &#038; Redevelopment Project</title>
		<link>https://csdengineering.ie/mater-private-hospital-major-expansion-redevelopment-project/</link>
					<comments>https://csdengineering.ie/mater-private-hospital-major-expansion-redevelopment-project/#respond</comments>
		
		<dc:creator><![CDATA[csdengin]]></dc:creator>
		<pubDate>Thu, 20 Sep 2018 07:52:44 +0000</pubDate>
				<category><![CDATA[Healthcare]]></category>
		<category><![CDATA[Projects]]></category>
		<guid isPermaLink="false">http://project.blueberry.ie/csdengineering/cms/?p=73</guid>

					<description><![CDATA[<p>Extension to the West Wing at 3No levels, construction of new floor above existing hospital (shell &#38; core) and redevelopment of existing areas. The project involved the development of complex phasing procedures as the hospital was required to continue fully in operation throughout the construction period. Architects: MCA Achitects Completion Date: 2014 Project Features: The [&#8230;]</p>
<p>The post <a href="https://csdengineering.ie/mater-private-hospital-major-expansion-redevelopment-project/">Mater Private Hospital Major Expansion &#038; Redevelopment Project</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Extension to the West Wing at 3No levels, construction of new floor above existing hospital (shell &amp; core) and redevelopment of existing areas. The project involved the development of complex phasing procedures as the hospital was required to continue fully in operation throughout the construction period.</p>
<p><strong>Architects</strong>: MCA Achitects</p>
<p><strong>Completion Date</strong>: 2014</p>
<p><strong>Project Features</strong>:</p>
<p>The new areas, comprising approximately 3153sqm in total, accommodate a Day Therapy and Endoscopy Facility, Day Oncology Unit, 4th floor ward extension and a Hybrid Theatre, Ancillary Theatre accommodation and central Atrium.</p>
<p><strong>Mechanical &amp; Service Features</strong>:</p>
<ul>
<li>New heating, ventilation and air-conditioning systems to HTM-03 Standard to serve new and redeveloped areas.</li>
<li>Upgrade of existing central chilled water system including new chillers and pump house.</li>
<li>Upgrade of existing central LPHW heating installation including new boiler and primary pumping installation.</li>
<li>Expansion of existing medical gas installation including new standby oxygen supply and distribution line.</li>
<li>Upgrade of existing central domestic hot water service installation including installation of solar collector at roof level.</li>
<li>New IPS/UPS cardiac protected services to theatre and day therapy areas.</li>
<li>Modifications to main distribution system and standby power generation to include load shedding control strategy.</li>
</ul>
<p>The post <a href="https://csdengineering.ie/mater-private-hospital-major-expansion-redevelopment-project/">Mater Private Hospital Major Expansion &#038; Redevelopment Project</a> appeared first on <a href="https://csdengineering.ie">CSD Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://csdengineering.ie/mater-private-hospital-major-expansion-redevelopment-project/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
