Kerry Group Global Centre A3 Fit-out Project

Redesign of the existing Corporate Offices in Naas, Co. Kildare. Areas to include Executive Offices, Meeting Rooms, Boardroom, Phone Booths, Open Plan Office and Social Spaces.

Architects: Design Folk

Project Duration: 4 months

Completion Date: 2019

Project Features:

  • High end architectural & services finish
  • Multiple phases in order to minimize disruption to the client

Services Features:

  • Upgrade of existing Lighting and Emergency Lighting installation
  • Data & power distribution to offices and audio visual equipment
  • Modifications to fire alarm installation integrated into the existing system
  • Audio visual fit out in meeting and boardrooms
  • Alterations to existing VAV air conditioning systems

Modifications to sprinkler installation

Mater Private Hospital Five Lamps Offices Fit Out

Refurbishment of existing third and fourth offices for MPH Accounts.

Architects: MCA Architects

Project Duration: 3 months

Completion Date: 2018

Services Features:

  • Alterations to existing DX air conditioning system to suit revised cellular and open plan office layout
  • Modifications to existing water services installation to suit new canteen facilities
  • Modifications / extension of existing general services and data installation to suit revised workstation layout
  • Modifications to existing lighting and emergency lighting installation
  • Modifications to existing fire alarm installation

 

CSI Ireland Headquarters

Refurbishment of listed building on Merrion Square Dublin to provide new Ireland Headquarters for the CSI including Reception, Offices, Training Rooms and Boardroom.

Archictects: Gensler Architects

Project Duration: 6 months

Completion Date: 2017

Project Features:

  • Liaison with Conservation Architect
  • High end architectural & services finish
  • Liaison with US based Architect and Data Specialist

Services Features:

  • New gas fired boiler plant and LPHW pipework distribution
  • New main distribution board and power distribution throughout listed building
  • New lighting and emergency lighting installation
  • New fire alarm installation
  • Audio visual fit out in all areas
  • New general services and data installation

HP Liffey Valley Building 1 Redevelopment

Redesign of the existing Hewlett Packard Enterprise Offices in Liffey Park, Leixlip. Areas include Reception, Meeting Rooms, Boardroom, Phone Booths, Open Plan Office, Canteen and Social Spaces.

Architects: Design Folk

Project Duration: 6 months

Completion Date: 2017

Project Features: 

  • High end architectural & services finish
  • Multiple phases in order to minimize disruption to the client

Services Features:

  • Bespoke timber slotted ceilings with integrated architectural lighting and air distribution system
  • Lighting dimming management controls
  • Data & power distribution to offices and audio visual equipment
  • New fire alarm installation integrated into the existing system
  • Audio visual fit out in meeting and boardrooms
  • Alterations to existing VAV air conditioning systems
  • New comms room

Mater Private Hospital Level 05

Fit-out of new floor level over existing main hospital. The project included complex phasing procedures to ensure hospital functionality on the floors below was maintained at all times throughout the construction period.

Architects: MCA Architects

Completion Date: 2016

Project Features:

Enabling works at Level 04, new 28 Bed Ward Accommodation, 2 Bariatric Bedrooms, Isolation Room and ancillary hospital accommodation.

Mechanical & Electrical Services Features:

  • New heating, ventilation and air-conditioning systems to HTM-03 Standard
  • Expansion of existing central chilled water & LPHW heating installations to serve new AHUs
  • Expansion of existing water services installation to serve Level 05.
  • Expansion of existing medical gas installation to serve Level 05.
  • Alterations to existing soils and wastes drainage installation to serve Level 05
  • New electrical general services installations
  • New lighting & emergency lighting systems
  • New fire alarm & access control systems
  • Expansion of existing Nurse Call system
  • New comms room at Level 05

Northern Cross Nursing Home

147 Bed Nursing Home Development, 6 floors over basement.

Architects: JNP Architects

Project Duration: 18 months

Project Completion: August 2015

Services Features:

  • Power and data/wifi distribution systems
  • Lighting and emergency lighting systems c/w controls
  • Fire alarm and detection systems
  • Standby generator system
  • CCTV / security systems
  • Nurse call systems
  • Access control systems

 

Modifications & Expansion to suit Mater Private Hospital Operation

Modification and expansion of new hospital to provide the following additional facilities:

  • Pharmacy
  • CSSD
  • ICU / HDU
  • Cardiology Centre
  • Oncology Department

Architects: MCA Architects

Completion Date: 2014

Services Features:

  • New RO Water treatment system
  • Additional HVAC Chiller plant
  • HVAC to CSSD / Pharmacy
  • Standby Generator upgrade
  • Central Water Storage upgrade
  • Dual fuel heating system (Oil / Gas)

 

Mater Private Hospital Cardiology Centre

Mater Private Hospital Cardiology Centre Expansion and Catheterisation Laboratory 3

Expansion at Level 01 and refurbishment of the existing Cardiology Centre over a number of phases to ensure the hospital continued in full operation throughout the construction period.

Architects: MCA Architects

Project Features:

New Catheterisation Laboratory, Ancillary Theatre accommodation, Consultant Suites, ECG rooms and Theatre Recovery Ward.

Services Features:

  • New heating, ventilation and air conditioning systems to HTM-03 Standard to serve the Cardiology Centre
  • Specialised electrical systems for Cardiac / Body protected areas
  • Bespoke Surgeon Control Panels
  • Fully integrated Nurse / Cardiac Call System
  • Modifications to mechanical services systems serving Level 01 without interruption to adjacent areas
  • Modifications to electrical general services serving Level 01 without interruption to adjacent areas

Teva Pharmaceuticals Central Utilities Upgrade Project

Upgrade of existing central Chilled Water and Compressed Air systems including replacement of existing chillers and compressed air plant, new plantroom header arrangement, modifications to the site wide distribution network and implementing energy saving 2-port valve arrangement on the chilled water system.

Architects: Fewer Harrington & Partners

Project Duration: 9 months

Completion Date: November 2016

Service features:

  • New air cooled chiller plant (2MW)
  • New flow and return header arrangement
  • New primary and secondary circuit pumpsets
  • Modifications to site wide distribution network to suit new headers
  • 2-port valve installation and recommissioning
  • BMS controls upgrade
  • New compressed air plant (compressors, dryers, receivers)
  • Modifications to site wide distribution network

Hewlett Packard Chilled Water Upgrade

Upgrade of existing site wide chilled water system including replacement Cooling Towers, pipework and BMS controls modifications.

Project Duration: 18 months

Completion Date: 2017

Service Features:

  • Replace 4No existing 3.75MW cooling towers with new
  • Replace existing pumpsets with new
  • Enabling and strip-out works
  • Pipework modifications
  • BMS controls modifications and recommissioning